Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Bayview Multimodal Project
0% in published scope
Public Works · Streetscape · Design · Starts 30 Jun 2027, ends 31 Dec 2028
All 23 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 3rd St, Bancroft Ave, Cargo Way, Carroll Ave, Evans Ave, Fairfax Ave
- Planned bikeway
- Shared street, 2.6 mi on Mendell St, Keith St, Lane St, Innes Ave
- Would reach
- 4,573 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 23 street segments that lack one. Closer in: 6,177 residents with none within about one block (440 feet) today would have one; 7,364 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “Installation of new bulbouts, traffic signals, landscaping, decorative asphalt, pavement, curb ramps and related work in the Bayview District”
- Dates
Start End Public consultation not published not published Construction Jun 2027 Dec 2028 - Official source
- No Public Works page for this job, and no closest official source found: Public Works' site search for “Bayview Multimodal” returned only the Bayview Transportation Improvements Project, a different network plan whose environmental review ran from 2004 to 2014, not this job's bulbouts and signals (2026-09-29).
- Records
- Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
7 decisions on the same streets, not naming this project
- ESTABLISH – TOW–AWAY, NO PARKING ANY TIME A. Evans Avenue, south side, from Rankin Street to 193 feet easterly (removes 7 unmetered parking spaces in the vicinity of rail crossing) B. Evans Avenue, south side, from 483 f…14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line, with JMB Construction, Inc.; and authorize the General Manager to approve future mo…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- Approve an increase of 96 calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line; and authorize the General Manager to approve future modifications to the contract for a total co…9 Mar 2021 · SFPUC Commission · approve Consent items 9c, d, f, and h
- 10(a). ESTABLISH – CLASS IV BIKEWAY A. Evans Avenue, south side, from Keith Street to Jennings Street B. Evan Avenue, both directions, from Jennings Street to Hunters Pt. Boulevard C. Hunters Point Boulevard, both direct…4 Dec 2020 · Engineering hearing · To be approved by the City Traffic Engineer for implementation after receipt of environmental clearance.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Evans Avenue, north side, from 67 feet to 146 feet west of Newhall Street (72-foot bike share station with red zones on either side) (Supervisor Dist…24 Jan 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 50 shared street segments
- Bayview Community PathwaySFMTA · Planning · 18 shared street segments
- WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith StSFPUC · Design · 9 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 7 shared street segments
- WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith StSFPUC · Construction · 5 shared street segments
- 3rd St from Mariposa St to Palou Ave Pavement RenovationPublic Works · Planning · 5 shared street segments
- 8 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith StPublic Works · Construction · 3 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 3 shared street segments
How we built this: About the Data