Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Bayview Multimodal Project

0% in published scope

Public Works · Streetscape · Design · Starts 30 Jun 2027, ends 31 Dec 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

All 23 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
3rd St, Bancroft Ave, Cargo Way, Carroll Ave, Evans Ave, Fairfax Ave
Planned bikeway
Shared street, 2.6 mi on Mendell St, Keith St, Lane St, Innes Ave
Would reach
4,573 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 23 street segments that lack one. Closer in: 6,177 residents with none within about one block (440 feet) today would have one; 7,364 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
“Installation of new bulbouts, traffic signals, landscaping, decorative asphalt, pavement, curb ramps and related work in the Bayview District”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2027Dec 2028
Official source
No Public Works page for this job, and no closest official source found: Public Works' site search for “Bayview Multimodal” returned only the Bayview Transportation Improvements Project, a different network plan whose environmental review ran from 2004 to 2014, not this job's bulbouts and signals (2026-09-29).
Records
Interagency coordination feed record (DataSF row)

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

202220232024202520262027202820292030todayBayview Multimodal ProjectBayview Community Based Transportati…WD-2921 8- and 12-inch Ductile Iron …8 & 12-Inch Ductile Iron Water Main …PW StreetResurfacingPro-BBSR Pavemen…WD-2937 2425-003: 8-inch Ductile Iro…Bayview Community PathwayVarious Locations Sewer Replacement …WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St: construction 1 Apr 2026 to 1 Apr 20288 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith St: construction 6 Apr 2026 to 4 Apr 2028PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St: construction 4 Aug 2027 to 4 Aug 2029Bayview Community Pathway: construction 2028 to 31 Dec 2028Various Locations Sewer Replacement No 39: construction 15 May 2028 to 14 Nov 2029Bayview Community Based Transportation Plan: construction 2022 to end not publishedBayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028from 20221 Jul 2026 – 7 Jul 202730 Jun 2027 – 31 Dec 20281 Apr 2026 – 1 Apr 20286 Apr 2026 – 4 Apr 20284 Aug 2027 – 4 Aug 20292028 – 31 Dec 202815 May 2028 – 14 Nov 2029

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

8 other projects on these street segments