Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Brotherhood/Alemany Safety Improvements Project
Not stated
SFMTA · Bike, walk or safety · Coordination and Funding Plan · Under way, ends 31 Dec 2027
3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Brotherhood Way, Alemany Blvd
- Planned bikeway
- Separated bikeway, 0.29 mi on Brotherhood Way, Alemany Blvd
Shared street, 0.077 mi on Alemany Blvd - Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 228 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential adjacent development of a public library. The project will design and construct one or more signalized pedestrian crossings of Alemany Boulevard at the Brotherhood Way and Sagamore/Orizaba intersections. Ancillary work may include sidewalk reconstruction, bulbouts and curb ramps; new traffic signal cabinets, conduit and poles; reconfiguration of travel lanes and median islands; and landscaping.”
- Dates
Start End Public consultation 2023-2024 2023-2024 Construction Feb 2023 Dec 2027 - Sources disagree
- SFMTA gives no phase; the coordination feed gives Planning.
- Records
- SFMTA project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 milestones and events from the project's own page
- Coordination and Funding Plan2024-2026 · Project page timeline · Pending
- Conceptual Design and Public Outreach2023-2024 · Project page timeline · Completed
1 decisions on the same streets, not naming this project
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
5 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 2 shared street segments
- PG&E Power Asset AcquisitionSFPUC · Planning · 2 shared street segments
- Brotherhood-Alemany Quick-Build ProjectSFMTA · Planning · 2 shared street segments
- Brotherhood Way Pavement RenovationPublic Works · Planning · 1 shared street segment
- Bikeway HardeningSFMTA · Planning · 1 shared street segment
1 documents on the project page
How we built this: About the Data