252 street projects under way or coming up on the Biking and Rolling Plan's network.
Street Resurfacing Program- BBSR Paving FY 26-27
0% in published scope
Public Works · Repaving · Construction · Under way, ends 7 Jul 2027
21 of the project's 28 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 14th Ave, 14th St, 15th Ave, 15th St, 16th Ave, 19th St
- Planned bikeway
- Shared street, 2.7 mi on Octavia St, Golden Gate Ave, Santa Clara Ave, 7th Ave
Separated bikeway, 0.89 mi on Channel St, 7th Ave, Clement St, Octavia St - Would reach
- 7,733 residents (2020 census), 3 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 21 street segments that lack one. Closer in: 6,498 residents, 1 school with none within about one block (440 feet) today would have one; 6,786 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Jul 2026 Jul 2027 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
28 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 14th Street, north side, from 37 feet to 53 feet east of Woodward Street (for 16-foot corral) 12(b). RESCIND – RED ZONE 14th Street, north side, from Woodward Street to 10…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 248 calendar days to the existing duration contingency for Contract No. WW-747, Seacliff Avenue Pump Station & Force Main Upgrade and Seacliff 1 Pump Station Demolition, with Minerva Construction, …9 Jun 2026 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2874, 8- and 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets; approv…24 Mar 2026 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- ESTABLISH – RED ZONE A. Sanchez Street, west side, from 30th St to 16 feet northerly (for daylighting and Painted Safety Zone/6-foot island bulb) B. Sanchez Street, east side, from 30th Street to 20 feet northerly (for P…7 Mar 2025 · Engineering hearing · Clarified blue zone location for item 9(d)A. Approved by the City Traffic Engineer for implementation.
- ESTABLISH – RED ZONE A. Sanchez Street, west side, from 30th St to 16 feet northerly (for daylighting and B. Painted Safety Zone/6-foot island bulb) C. Sanchez Street, east side, from 30th Street to 20 feet northerly (fo…21 Feb 2025 · Engineering hearing · Item withdrawn by staff.
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-747, Seacliff Avenue Pump Station & Force Main Upgrade and Seacliff 1 Pump Station Demolition to the responsible bidder that submitted the lowest responsive bid, Minerva Construction, Inc., in the a…27 Aug 2024 · SFPUC Commission · approve Consent Calendar Items 6a, and 6c through 6g
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANYTIME, EXCEPT BICYCLES Octavia Street, east side, from 15 feet to 25 feet south of Oak Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Carmen Leung, [staff email removed …14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- Award Contract No. WD-2765, 8-Inch and 16-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass Street to Church Street and Various Street Locations, to the responsible bidder that submitted the lowest …9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Award Contract No. WD-2874, 8-Inch & 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets, to the responsible bidder that submitted the lowest respons…14 Nov 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – SIDEWALK BIKE SHARE STATION 14th Avenue, east side, from 5 feet to 78 feet south of Geary Boulevard (72 feet 6 inch bike share station with a 20-foot red zone daylighting at the northern end of the station) (…18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Waller Street, south side, from Shrader Street to 80 feet westerly (72-foot station with red zones on either side) (Supervisor District 5) (Approvabl…21 Jul 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Award Contract No. WD-2801, 8- and 12-Inch Ductile Iron Water Main Replacement, 16- Inch Earthquake Resistant Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation, from Mariposa Street to Cesa…14 Feb 2023 · SFPUC Commission · approve Consent Calendar items 6a through 6h
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by Mitchell Engineering for Contract No. WD-2719, 8-Inch Ductile Iron Pipe and 12-Inch Earthquake Resistant Ductile Iron Pipe Water Main Installation on 22nd Street from Fair Oaks Street to Hampshir…24 Aug 2021 · SFPUC Commission · approve Item 10
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Washington Street, south side, from 62 feet to 145 feet west of Van Ness Avenue (72-foot bike share station with red zones on either side) (Superviso…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 14th Avenue, east side, from Geary Boulevard to 82 feet southerly (72-foot bike share station with red zones on either side) (Supervisor District 1) …4 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 14 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 9 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 8 shared street segments
- Seacliff No 2 Pump Station and Force Main UpgradePublic Works · Construction · 7 shared street segments
- Seacliff No 2 Pump Station RefurbPublic Works · Construction · 7 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 6 shared street segments
- Slow StreetsSFMTA · Construction · 5 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 4 shared street segments