Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Lincoln Way New Traffic Signals
No known overlap
SFMTA · Bike, walk or safety · Detailed Design · Starts 1 Apr 2028, ends 31 Mar 2029
None of the project's street segments is on the Biking and Rolling Plan's network. It is listed because SFMTA tags the project Bike.
- Streets
- Lincoln Way
- Planned bikeway
- Nothing on these street segments.
- Scope
- “Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals (APS) in addition to new ADA compliant curb ramps where they do not already exist.”
- Dates
Start End Public consultation not published not published Construction Apr 2028 Mar 2029 - Sources disagree
- SFMTA gives no phase; the coordination feed gives Design.
- Records
- SFMTA project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- ESTABLISH – TRAFFIC SIGNAL 45th Avenue and Lincoln Way La Playa, Lincoln Way, and Martin Luther King Jr. Drive (Approvable by the City Traffic Engineer) 7(b). ESTABLISH – CROSSWALK CLOSURE Crossing Lincoln Way, east side…3 Oct 2025 · Engineering hearing · Clarified approval paths. Items 7(a) and 7(c) approved by the City Traffic Engineer for implementation. Item 7(b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
2 milestones and events from the project's own page
- Board of Directors Meeting, December 16, 202516 Dec 2025 · Project page event
- Engineering Public Hearing Meeting, October 3, 20253 Oct 2025 · Project page event
4 decisions on the same streets, not naming this project
- Approving protected bikeway and traffic modifications on Lincoln Way and Sloat Boulevard, endorsing the closure of the Upper Great Highway and adopting the closure and findings of Proposition K3 Dec 2024 · SFMTA Board · ADOPTED — 5 ayes, 1 nay (Resolution 241203-134)
- ESTABLISH – ESTABLISH - RIGHT LANES MUST TURN RIGHT ESTABLISH – NO LEFT TURNS, NO U-TURNS ESTABLISH – NO RIGHT TURN ON RED Lincoln Way, westbound at Upper Great Highway (Approvable by the City Traffic Engineer) 16(b). ES…4 Jun 2021 · Engineering hearing · Continued.
- Accept work performed by Marinship Development Interest, LLC, for Contract No. WW-694, Lincoln Way/48th Ave Diversion Structure Modification; approve Modification No. 1 (Final), decreasing the contract amount by $7,400, …9 Feb 2021 · SFPUC Commission · approve Consent Calendar items 9a through 9d
- Approve the plans and specifications for Lincoln Way/48th Ave Diversion Structure Modification, in the amount of $967,98014 Apr 2020 · SFPUC Commission
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
1 other projects on these street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side StreetsSFPUC · Design · 2 shared street segments