SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St

0% in published scope

SFPUC · Sewer, water or power · Design · Starts 4 Aug 2027, ends 4 Aug 2029

Early enough to change: SFPUC gives its phase as Design; its project page may list a contact. No meeting on it is posted for the next 60 days.

All 4 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Hawes St, Ingalls St, Jennings St, Keith St, Lane St, Shafter Ave
Planned bikeway
Shared street, 0.57 mi on Lane St, Underwood Ave
Would reach
3,411 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 2,490 residents with none within about one block (440 feet) today would have one; 3,766 residents with none within about two blocks (880 feet) today would have one
Scope
“Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionAug 2027Aug 2029
Records
Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

4 decisions on the same streets, not naming this project

Construction on these street segments

202220232024202520262027202820292030todayWD-2937 2425-003: 8-inch Ductile Iro…Bayview Community Based Transportati…PW As Needed Spot Sewer Replacement …WD-2921 8- and 12-inch Ductile Iron …PW StreetResurfacingPro-BBSR Pavemen…Bayview Multimodal ProjectBayview Community PathwayVarious Locations Sewer Replacement …PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St: construction 1 Apr 2026 to 1 Apr 2028PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Bayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028Bayview Community Pathway: construction 2028 to 31 Dec 2028Various Locations Sewer Replacement No 39: construction 15 May 2028 to 14 Nov 2029Bayview Community Based Transportation Plan: construction 2022 to end not publishedWD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St: construction 4 Aug 2027 to 4 Aug 2029from 202222 Sep 2025 – 26 Oct 20261 Jul 2026 – 7 Jul 20274 Aug 2027 – 4 Aug 20291 Apr 2026 – 1 Apr 202830 Jun 2027 – 31 Dec 20282028 – 31 Dec 202815 May 2028 – 14 Nov 2029

Construction start and end as each department publishes them; a dot where only one is published.

7 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.