WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St
0% in published scope
SFPUC · Sewer, water or power · Design · Starts 4 Aug 2027, ends 4 Aug 2029
All 4 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Hawes St, Ingalls St, Jennings St, Keith St, Lane St, Shafter Ave
- Planned bikeway
- Shared street, 0.57 mi on Lane St, Underwood Ave
- Would reach
- 3,411 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 2,490 residents with none within about one block (440 feet) today would have one; 3,766 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St”
- Dates
Start End Public consultation not published not published Construction Aug 2027 Aug 2029 - Records
- Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- Ordinance ordering the vacation of portions of Hawes Street, Griffith Street, and Bancroft Avenue for the development of the San Francisco Fire Department Training Facility at 1236 Carroll Avenue; reserving public utilit…13 Jan 2026 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on January 6, 2026, at 3:00 p.m., to hold a public hearing on an Ordinance ordering the vacation of portions of Hawes Street, Griffith Street, and B…6 Jan 2026 · Board of Supervisors · Filed
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
7 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 31 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 9 shared street segments
- Bayview Community PathwaySFMTA · Planning · 5 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 3 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 2 shared street segments
- WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith StSFPUC · Construction · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment