Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PEFWS Pipeline Contract G - 36-Inch Water
0% in published scope
SFPUC · Sewer, water or power · Planning · Starts 1 Oct 2028, ends 1 Jan 2032
All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 24th Ave, 28th Ave, Quintara St
- Planned bikeway
- Shared street, 1.5 mi on 28th Ave
- Would reach
- 2,352 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 3,007 residents with none within about one block (440 feet) today would have one; 3,584 residents with none within about two blocks (880 feet) today would have one
- Scope
- “None”
- Dates
Start End Public consultation not published not published Construction Oct 2028 Jan 2032 - Sources disagree
- The coordination feed gives construction starting 2028-10-01; SFPUC's project page text gives 2027 (“2027”).
- Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 24th Avenue, west side, from 10 feet to 73 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 28th Avenue, east side, from 42 feet to 98 feet south of Geary Boulevard (53-foot bike share station with red zones on either side) (Supervisor Distr…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
3 other projects on these street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 1 shared street segment
- Noriega St and Quintara St Pavement RenovationPublic Works · Planning · 1 shared street segment
- PEFWS Pipeline Contract F- 24-Inch WaterSFPUC · Planning · 1 shared street segment
How we built this: About the Data