Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Laguna and Howard CSD Improvements
0% in published scope
Public Works · Sewer, water or power · Construction · Under way, ends 25 Feb 2027
3 of the project's 5 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 3rd St, 4th St, Channel St, Howard St, Laguna St
- Planned bikeway
- Bikeway of undecided type, 0.28 mi on 4th St
Separated bikeway, 0.2 mi on 3rd St, Howard St - Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 468 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “2310i”
- Dates
Start End Public consultation not published not published Construction Dec 2025 Feb 2027 - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
14 decisions on the same streets, not naming this project
- ESTABLISH – SIDEWALK BIKESHARE STATION Laguna Street, east side, from 19 feet to 71 feet north of Turk Street (Supervisor District 5) (Approvable by the City Traffic Engineer)4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Laguna Street, west side, from Union Street to 23 feet northerly (in existing red zone) Laguna Street, east side, from Union Street to 23 feet southe…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from 19 feet to 50 feet north of King Street (31-foot bike share station) (Supervisor District 6) (Approvable by the City Tra…14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- RESCIND – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Howard Street, westbound, north side, between The Embarcadero and 4th Street (curbside bike lane with buffer and floating parking) 12(b). ESTABLISH – CLASS IV BIKEWA…2 Feb 2024 · Engineering hearing · Noted approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Laguna Street, east side, from 5 feet to 15 feet south of Hayes Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Carmen Leung, [staff email removed…19 Jan 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES Howard Street, south side, from 45 feet to 66 feet east of 2nd Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Laguna Street, west side, from Grove Street to 86 feet northerly (Supervisor District 5) (Approvable by the City Traffic Engineer) Laura Stonehill, […19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles RESCIND -NO THROUGH TRAFFIC AFTER BA…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- RESCIND--TWO HOUR PARKING, MONDAY THROUGH FRIDAY, 8 AM TO 9 PM, EXCEPT VEHICLES WITH AREA S PERMITS (retains RPP eligibility) Laguna Street, east side, between Hayes Street and Linden Street (Supervisor District 5) Kathr…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer to send to the SFMTA Board for approval and implementation. # Sustainable Streets Division
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 165 feet to 239 feet east of 6th Street (74-foot bike share station) (Supervisor District 6) Project Contact: Laura S…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Laguna Street, east side, from 45 feet to 116.5 feet south of Washington Street (70-foot, 1-inch bike share station including delineators) (Supervisor District 2) Laura Stonehill, …18 Oct 2019 · Engineering hearing · Hold. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Train Control Upgrade Project - Phase 1Public Works · Design · 8 shared street segments
- Northern Waterfront Electrical Improvements (NWEI)SFPUC · Planning · 3 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 3 shared street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 3 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 3 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 2 shared street segments
- Stormwater Trash Capture Phase 2Public Works · Planning · 2 shared street segments
- Central Embarcadero Safety ProjectSFMTA · 1 shared street segment