Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 27

0% in published scope

Public Works · Sewer, water or power · Design · Starts 19 Feb 2027, ends 19 Feb 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

2 of the project's 3 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Avoca Aly, Bella Vista Way, Belvedere St, Carmel St, Caselli Ave, Cedro Ave
Planned bikeway
Shared street, 0.51 mi on Dewey Blvd, Vicente St
Would reach
3,018 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 931 residents with none within about one block (440 feet) today would have one; 2,071 residents, 1 library with none within about two blocks (880 feet) today would have one
Scope
“2507i, WW-774”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionFeb 2027Feb 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

11 decisions on the same streets, not naming this project

Construction on these street segments

202420252026202720282029203020312032todayVarious Locations Sewer Replacement …PEFWS Pipeline Contract B - 36-inch …PW As Needed Spot Sewer Replacement …Street Resurfacing Program- BBSR Pav…Various Locations Pavement Renovatio…Monterey Blvd Pavement RenovationPortola Dr Pavement RenovationPEFWS Pipeline Contract B - 36-inch Welded Steel Pipe: construction 1 Apr 2024 to 1 Mar 2028PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Various Locations Pavement Renovation No 90: construction Aug 2026 to 12 Oct 2027Monterey Blvd Pavement Renovation: construction 29 Apr 2028 to 13 Jul 2029Portola Dr Pavement Renovation: construction 28 May 2030 to 10 Aug 2031Various Locations Sewer Replacement No 27: construction 19 Feb 2027 to 19 Feb 202819 Feb 2027 – 19 Feb 20281 Apr 2024 – 1 Mar 202822 Sep 2025 – 26 Oct 20261 Jul 2026 – 7 Jul 2027Aug 2026 – 12 Oct 202729 Apr 2028 – 13 Jul 202928 May 2030 – 10 Aug 2031

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.