Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 27
0% in published scope
Public Works · Sewer, water or power · Design · Starts 19 Feb 2027, ends 19 Feb 2028
2 of the project's 3 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Avoca Aly, Bella Vista Way, Belvedere St, Carmel St, Caselli Ave, Cedro Ave
- Planned bikeway
- Shared street, 0.51 mi on Dewey Blvd, Vicente St
- Would reach
- 3,018 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 931 residents with none within about one block (440 feet) today would have one; 2,071 residents, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- “2507i, WW-774”
- Dates
Start End Public consultation not published not published Construction Feb 2027 Feb 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
11 decisions on the same streets, not naming this project
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- Accept work performed by KJ Woods Construction, Inc., under Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement; approve Modification No. 8 (Final) decreasing the contract am…9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Belvedere Street, west side, from 22 feet to 83 feet south of Haight Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Laura S…2 Dec 2022 · Engineering hearing · Item put on hold at the request of the Mayor’s Office.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Detroit Street, east side, from Hearst Avenue to 63 feet southerly (52-foot bike share station with red zones on either end) (Supervisor District 7) …19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- ESTABLISH: TOW-AWAY, NO STOPPING ANYTIME ESTABLISH: CLASS II BIKE WAY Dewey Boulevard, south side, from Laguna Honda Boulevard to 104 feet westerly (Supervisor District 7) (Requires approval by the SFMTA Board) John Garz…1 Oct 2021 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approve the plans and specifications, and award Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement Project, in the amount of $29,132,100 and with a duration of 987 consecuti…13 Apr 2021 · SFPUC Commission · approve Consent Calendar item 15
- Approve the plans and specifications, and award Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement Project, in the amount of $29,132,100 and with a duration of 987 consecuti…23 Mar 2021 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME A. Dewey Boulevard, south side, from Dewey Circle to 55 feet easterly (new parking restriction) B. Dewey Boulevard, north side, from Pacheco Street to 49 feet westerly (new parking restric…24 Jan 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. # Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- PEFWS Pipeline Contract B - 36-inch Welded Steel PipeSFPUC · Design · 3 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 2 shared street segments
- Slow StreetsSFMTA · Construction · 1 shared street segment
- Various Locations Pavement Renovation No 90Public Works · Construction · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Portola Dr Pavement RenovationPublic Works · Planning · 1 shared street segment
- Monterey Blvd Pavement RenovationPublic Works · Design · 1 shared street segment
- District 11-Wide Traffic Calming ProjectSFMTA · 1 shared street segment