Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Large Diameter Sewer Improvements No 1

0% in published scope

Public Works · Sewer, water or power · Design · Starts 4 Mar 2027, ends 1 Apr 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

2 of the project's 9 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
10th Ave, 17th St, 1st St, 4th St, 6th Ave, Anza St
Planned bikeway
Shared street, 0.89 mi on Lake St, Anza St, Jackson St
Would reach
396 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 12 residents with none within about one block (440 feet) today would have one; 155 residents with none within about two blocks (880 feet) today would have one
Scope
“2500i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2027Apr 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer System Upgrades

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

19 decisions on the same streets, not naming this project

Construction on these street segments

2024202520262027202820292030todayVarious Locations Large Diameter Sew…Folsom-Howard Streetscape ProjectContract 36 Traffic Signal Modificat…Transbay Howard Streetscape Improvem…Folsom-Howard Streetscape Project: construction 2024 to 31 Dec 2029Contract 36 Traffic Signal Modifications: construction Apr 2024 to 31 May 2026Transbay Howard Streetscape Improvement Project: construction 2026 to 31 Dec 2028Various Locations Large Diameter Sewer Improvements No 1: construction 4 Mar 2027 to 1 Apr 2028Apr 2024 – 31 May 20264 Mar 2027 – 1 Apr 20282026 – 31 Dec 20282024 – 31 Dec 2029

Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.