SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St

0% in published scope

SFPUC · Sewer, water or power · Construction · Under way, ends 1 Apr 2028

All 8 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Hawes St, Ingalls St, Jennings St, Keith St, Lane St, Palou Ave
Planned bikeway
Shared street, 1.7 mi on Quesada Ave, Palou Ave, Lane St
Would reach
2,120 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 2,884 residents, 1 library with none within about one block (440 feet) today would have one; 2,944 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
“8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2026Apr 2028
Sources disagree
The coordination feed gives construction starting 2026-04-01; SFPUC's project page text gives 2026-06 (“June 2026”).
The coordination feed gives construction ending 2028-04-01; SFPUC's project page text gives 2028-06 (“June 2028”).
Records
SFPUC project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

4 decisions on the same streets, not naming this project

Construction on these street segments

20222023202420252026202720282029todayWD-2921 8- and 12-inch Ductile Iron …Bayview Community Based Transportati…PW As Needed Main Sewer Replacement …PW As Needed Spot Sewer Replacement …8 & 12-Inch Ductile Iron Water Main …PW StreetResurfacingPro-BBSR Pavemen…Various Locations Sewer Replacement …Bayview Multimodal ProjectBayview Community PathwayPW As Needed Main Sewer Replacement No 10: construction 30 Sep 2024 to 2 Sep 2027PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 20268 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith St: construction 6 Apr 2026 to 4 Apr 2028PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Various Locations Sewer Replacement No 24: construction 25 Mar 2027 to 26 Mar 2028Bayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028Bayview Community Pathway: construction 2028 to 31 Dec 2028Bayview Community Based Transportation Plan: construction 2022 to end not publishedWD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St: construction 1 Apr 2026 to 1 Apr 2028from 20221 Apr 2026 – 1 Apr 202830 Sep 2024 – 2 Sep 202722 Sep 2025 – 26 Oct 20266 Apr 2026 – 4 Apr 20281 Jul 2026 – 7 Jul 202725 Mar 2027 – 26 Mar 202830 Jun 2027 – 31 Dec 20282028 – 31 Dec 2028

Construction start and end as each department publishes them; a dot where only one is published.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.