Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 86A
0% in published scope
Public Works · Repaving · Design · Starts 4 Sep 2027, ends 16 Nov 2028
All 10 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Auburn St, Beckett St, Cordelia St, Gough St, Himmelmann Pl, Jackson St
- Planned bikeway
- Shared street, 1 mi on Pacific Ave
- Would reach
- 25,614 residents (2020 census), 2 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 10 street segments that lack one. Closer in: 13,180 residents, 2 schools with none within about one block (440 feet) today would have one; 20,313 residents, 1 school, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Sep 2027 Nov 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Jackson Street, north side, from 10 feet to 90 feet east of Sansome Street (80-foot station) (Supervisor District 3) (Approvable by the City Traffic…20 Oct 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- ESTABLISH – SIDEWALK BIKE SHARE STATION Green Street, north side, from 64.5 feet to 116 feet west of Gough Street (50’-5” bike share station) (Supervisor District 2) Laura Stonehill, [staff email removed — see the order]…18 Oct 2019 · Engineering hearing · Hold Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
2 other projects on these street segments
- Various Locations Sewer Replacement No 29Public Works · Design · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment