Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Sutter St and Post St Large Diameter Sewer Rehabilitation
0% in published scope
Public Works · Sewer, water or power · Design · Starts 30 Aug 2029, ends 12 Nov 2030
All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Franklin St, Leavenworth St, Mason St, Post St, Sutter St
- Planned bikeway
- Bikeway of undecided type, 0.27 mi on Post St, Sutter St
- Would reach
- 10,164 residents (2020 census), 3 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 8,841 residents with none within about one block (440 feet) today would have one; 14,309 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2682i”
- Dates
Start End Public consultation not published not published Construction Aug 2029 Nov 2030 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer System Upgrades
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 decisions on the same streets, not naming this project
- RESCIND – YELLOW METERED ZONE, SIX-WHEEL COMMERCIAL LOADING, 30 MINUTE TIME LIMIT, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY Sutter Street, south side, from Taylor Street to 60 feet westerly (Stalls #701, #703, and #705) 16(b)…16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Sutter Street, south side, from 34 feet to 128 feet east of Montgomery Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Perm…4 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Post Street, south side, from 23 feet 9 inches to 43 feet 9 inches east of Pierce Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl, [st…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Mason Street, west side, from Bay Street to 67 feet southerly (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [sta…3 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- San Francisco Public Utilities Commission Employee Retirement Recognitions: Jack Lum, in recognition for his 35 years of exemplary service to the City and County of San Francisco. Alan Marshall, Enterprise Systems Manage…24 Jan 2023 · SFPUC Commission
- ESTABLISH – NO RIGHT TURN ON RED A. Franklin Street, northbound, at Broadway B. Broadway, westbound, at Franklin Street C. Franklin Street, northbound, at Green Street D. Green Street, westbound, at Franklin Street E. Fr…2 Dec 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Post Street, north side, from Baker Street to 88 feet easterly (75-foot bike share station with red zones on either side) (Supervisor District 5) Pro…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Post Street, north side, from 14 feet to 99 feet west of Webster Street (84-foot bike share station with red zones on either side) (Supervisor Distri…24 Jan 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
3 other projects on these street segments
- Sutter St and Post St Pavement RenovationPublic Works · Design · 7 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 1 shared street segment
- Safer Taylor StreetSFMTA · Completed · 1 shared street segment