Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Clay Slow Street
Builds 49%
SFMTA · Bike, walk or safety · Legislated · Under way, no end date published
4 of the project's 8 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.62 mi of the plan's bikeway.
- Streets
- Clay St, Steiner St, Arguello Blvd
- Planned bikeway
- Shared street, 0.8 mi on Clay St
Bikeway of undecided type, 0.25 mi on Steiner St
Separated bikeway, 0.21 mi on Arguello Blvd - Would reach
- 2,266 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 1,261 residents with none within about one block (440 feet) today would have one; 1,058 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction 2021 not published - Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Clay Street, south side, from 138 feet to 206 feet east of Lyon Street (63-foot bike share station in parking lane with red zones on either side) (Su…3 Jun 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Arguello Boulevard, east side, from 157 feet to 216 feet north of Edward Street (50-foot bike share station with red zones on either end) (Supervisor…1 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Steiner Street, east side, from 20 feet to 72 feet south of California Street (51-foot station) (Supervisor District 2) Laura Stonehill, [staff email removed — see the order] Propo…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Arguello Boulevard, east side, from Geary Boulevard to 52 feet northerly (Supervisor District 2) ♦ Laura Stonehill, [staff email removed — see the order] Proposing a Ford GoBike bi…16 Aug 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support.
1 other projects on these street segments
- Slow StreetsSFMTA · Construction · 3 shared street segments
1 documents on the project page