Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PEFWS Pipeline Contract E - 24-inch GGP Crossing
0% in published scope
SFPUC · Sewer, water or power · Planning · Under way, ends 1 Jan 2030
2 of the project's 7 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th Ave, 22nd Ave, 25th Ave, Cabrillo St, Fulton St, Martin Luther King Jr Dr
- Planned bikeway
- Separated bikeway, 0.72 mi on Transverse Dr
Shared street, 0.61 mi on Cabrillo St, 22nd Ave - Scope
- “None”
- Dates
Start End Public consultation not published not published Construction Jan 2026 Jan 2030 - Sources disagree
- The coordination feed gives construction starting 2026-01-01; SFPUC's project page text gives 2027 (“2027”).
The start date has passed (2026-01-01) while the phase is still Planning, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Fulton Street, south side, from 10 feet to 30 feet west of Pierce Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – STOP Signs Cabrillo Street, eastbound and westbound, at 2nd Avenue (Supervisor District 1) (Approvable by the City Traffic Engineer) Edward Tang, [staff email removed — see the order]2 Jun 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO LEFT TURN Fulton Street, eastbound, at 30th Avenue Fulton Street, eastbound, at 36th Avenue (Supervisor District 1) Dusson Yeung, [staff email removed — see the order] These changes are intended to improve…30 Oct 2020 · Engineering hearing · Approved, but will not be implemented at this time due to the Slow Street on Cabrillo. In the event the Slow Street on Cabrillo is still in active in 2022, SFMTA will implement the turn prohibition in 2022.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Golden Gate Park Traffic Safety ProjectSFMTA · Completed · 6 shared street segments
- Various Locations Sewer Replacement #21Public Works · Design · 5 shared street segments
- PW Various Locations Sewer Replacement No 21Public Works · Design · 3 shared street segments
- Golden Gate Park Access and Safety ProgramSFMTA · Legislated · 3 shared street segments
- PW 29 Sunset Improvement Project Phase 1Public Works · Design · 1 shared street segment
- PEFWS Pipeline Contract F- 24-Inch WaterSFPUC · Planning · 1 shared street segment
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 1 shared street segment
- Various Locations Sewer Replacement No 33Public Works · Design · 1 shared street segment