Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Howard Streetscape Project
Builds 55% Public Works' share of the joint Folsom-Howard Streetscape Project; the rating is the joint project's, from SFMTA's page and bikeway layer. This job's own feed description names no bike work.
Public Works · Streetscape · Design · Under way, ends 30 Nov 2028
All 17 of the project's street segments on planned bikeway streets already have an all-ages bikeway.
- Streets
- 10th St, 11th St, 5th St, 7th St, 8th St, 9th St
- Planned bikeway
- Separated bikeway, 1.1 mi on Howard St
- Scope
- “Transportation and streetscape improvements on Howard Street between 4th and 11th Streets 2314I”
- Dates
Start End Public consultation not published not published Construction Summer, 2026 Fall, 2028 - Sources disagree
- The coordination feed gives construction starting 2027-11-25; Public Works' project page (Start “Summer, 2026”; text “Summer, 2026”), 2026-07, which is shown.
The coordination feed gives construction ending 2031-04-17; Public Works' project page (Completion “Fall, 2028”; text “Fall, 2028”), 2028-11-30, which is shown.
The start date has passed (2026-07) while the phase is still Design, per the coordination feed. - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
5 decisions on the same streets, not naming this project
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – BLUE ZONE 11th Street, west side, from 15 feet to 40 feet south of Folsom Street 11(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, AT ALL TIMES, DAILY Folsom Street, south side, from 56 feet to 116 feet west of…2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 165 feet to 239 feet east of 6th Street (74-foot bike share station) (Supervisor District 6) Project Contact: Laura S…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Folsom-Howard Streetscape ProjectSFMTA · Current · 16 shared street segments
- 7th Street and 8th Street Safety ProjectsSFMTA · Completed · 4 shared street segments
- Mission, 8th, 9th, Howard and Natoma Brick Sewer RehabilitationPublic Works · Construction · 2 shared street segments
- 5th St Safety Improvement ProjectPublic Works · Planning · 1 shared street segment
- Chinatown and SOMA Large Diameter Sewer ImprovementsPublic Works · Design · 1 shared street segment
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 1 shared street segment
- Contract 36 Traffic Signal ModificationsSFMTA · Implementation / Construction · 1 shared street segment
- PW Various Locations Sewer Replacement No 18Public Works · Construction · 1 shared street segment