Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Noriega St and Quintara St Pavement Renovation
0% in published scope
Public Works · Repaving · Planning · Starts 28 Jun 2032, ends 11 Sep 2033
All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 20th Ave, 21st Ave, 22nd Ave, 23rd Ave, 24th Ave, 25th Ave
- Planned bikeway
- Shared street, 0.12 mi on Ortega St
- Would reach
- 644 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 727 residents with none within about one block (440 feet) today would have one; 879 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Resurfacing primarily along Noriega St between 19th Ave and Sunset Blvd”
- Dates
Start End Public consultation not published not published Construction Jun 2032 Sep 2033 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 25th Avenue North, north side, from 6 feet to 30 feet east of driveway at 4 25th Avenue North (Supervisor District 1) (Approvable by the City Traffic …18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 23rd Avenue, east side, from 10 feet to 73 feet south of Sloat Boulevard (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Continued.
- ESTABLISH – RIGHT TURN ONLY, EXCEPT BICYCLES 20th Avenue, northbound and southbound, at Taraval Street 14(b). ESTABLISH – RIGHT TURN ONLY 21st Avenue, northbound and southbound, at Taraval Street 14(c). ESTABLISH – RECTA…20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 280 calendar days to the contract duration contingency for Contract No. WW-691, Sunset Boulevard Greenway – Phase II, Irving Street to Ulloa Street with Minerva Construction, Inc.; and authorize th…27 Apr 2021 · SFPUC Commission · approve Consent Calendar items 9a and 9b
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 10 shared street segments
- 20th Avenue Neighborway ProjectSFMTA · Completed · 2 shared street segments
- WD-2877 As Needed Water Main Replacement No.3SFPUC · Design · 2 shared street segments
- PEFWS Pipeline Contract F- 24-Inch WaterSFPUC · Planning · 2 shared street segments
- Central Sunset 6other · Planning · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- As Needed City-wide Pavement Preservation 6 (General As-Needed Contract G29)Public Works · Construction · 1 shared street segment
- Sunset Irrigation Recycled WaterPublic Works · Design · 1 shared street segment