Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 79
0% in published scope
Public Works · Repaving · Design · Under way, ends 17 Nov 2026
9 of the project's 10 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th St, 23rd St, 8th St, Alameda St, Arkansas St, Berry St
- Planned bikeway
- Separated bikeway, 0.78 mi on Townsend St, Cesar Chavez St, Division St
Bikeway of undecided type, 0.34 mi on Townsend St - Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Winter, 2026 Nov 2026 - Sources disagree
- The coordination feed gives construction starting 2025-09-04; Public Works' project page (Start “Winter, 2026”; text “Winter, 2026”), 2026-01, which is shown.
The start date has passed (2026-01) while the phase is still Design, per the coordination feed. - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Various Locations Pavement Renovation No. 79 and Sewer Replacement to Michael O’Shaughnessy Construction, Inc. in the amount of $3,070,476.6024 Jul 2025 · Public Works Commission
8 decisions on the same streets, not naming this project
- ESTABLISH – GENERAL METERED PARKING, NO TIME LIMIT, 9AM TO 6PM MONDAY THROUGH SATURDAY Arkansas Street, both sides, from 16th Street to 200 feet southerly 7(b). ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X (Eligibility …26 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X 88 Arkansas Street 4(b). RESCIND – 4-HOUR PARKING, MON-SAT FROM 8 AM TO 6 PM ESTABLISH – 2-HOUR PARKING, MON-SAT FROM 8 AM TO 10 PM, EXCEPT FOR VEHICLES WITH AREA X PERMITS A…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – CLASS IV PROTECTED BIKEWAY Berry Street, westbound, north side, between 3rd Street and 4th Street 20(b). ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Berry Street, north side, from 4th Street to 449 feet easterl…21 Feb 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation after environmental clearance has been obtained. # comment applies to items 20(c) – 20(f). Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alameda Street, south side, from Henry Adams Street to 81 feet westerly (72-foot bike share station with red zones on either side) (Supervisor Distri…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Request made for alternate location.
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Division Street, eastbound, south side, between San Bruno Avenue and Vermont Street (curbside bike lane with buffer and floating parking) Division Street, westboun…21 Feb 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. # footnote applies to item 12(c). Public Comments: No comments received.
- ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Townsend Street, south side, from 3rd Street to 209 feet westerly (removes 5 general meter parking spaces) 26(b). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Townsend Street…24 Jan 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to send items 26(a) through 26(f) to the SFMTA Board for legislation. 26(g) and 26(h) amended as underlined per follow-up with public hearing attendees and approved by the City Traffic Engineer for implementation. # note applies to item 26(g). Public Com
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 7 shared street segments
- Cesar Chavez Bikeway Improvements ProjectSFMTA · Detailed Design · 6 shared street segments
- Townsend Corridor Improvement ProjectSFMTA · Completed · 4 shared street segments
- 7th Street and 8th Street Safety ProjectsSFMTA · Completed · 3 shared street segments
- PW Various Locations Sewer Replacement (JV VL PR No 79)Public Works · Design · 3 shared street segments
- FASIP Alameda Street Wet Weather Conveyance TunnelSFPUC · Design · 3 shared street segments
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 2 shared street segments
- 3rd Street Quick-Build ProjectSFMTA · Completed · 1 shared street segment
How we built this: About the Data