Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Cayuga Avenue Slow Street

Builds 80%

SFMTA · Bike, walk or safety · Detailed Design · Starts 1 Oct 2026, ends 31 Dec 2029

Early enough to change: SFMTA gives its phase as Detailed Design; its project page may list a contact. No meeting on it is posted for the next 60 days.

5 of the project's 25 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 2.3 mi of the plan's bikeway.

Streets
Cayuga Ave, Niagara Ave, Theresa St, San Juan Ave, Lyell St
Planned bikeway
Shared street, 2.9 mi on Cayuga Ave, Niagara Ave, San Juan Ave, Lyell St
Level 3 shared street, 0.11 mi on Theresa St
Would reach
470 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 5 street segments that lack one. Closer in: 119 residents with none within about one block (440 feet) today would have one
Scope
“Cayuga Slow Streets team is now shifting to detailed design followed by construction. We anticipate installing the first phase of measures in late 2026, including updated signage, daylighting zones, pedestrian safety zones, and an upgraded diverter at Geneva Avenue. Concrete islands with landscaping are planned for implementation in 2027.”
Dates
StartEnd
Public consultationEarly 20252026 - 2029
ConstructionOct 2026Dec 2029
Sources disagree
The project page's timeline gives construction starting 2026; the page's text gives 2023 (“2023”).
The project page's timeline and event cards give the latest public consultation as 2029-12-31; the page's text gives 2026-04-01 (“April 1, 2026”).
The coordination feed gives construction ending 2027-06-30; SFMTA's project page gives 2029-12-31, which is shown.
SFMTA gives the phase as Detailed Design; the coordination feed gives Construction.
Records
SFMTA project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

9 milestones and events from the project's own page
3 decisions on the same streets, not naming this project

Construction on these street segments

202220232024202520262027202820292030todayCayuga Avenue Slow StreetContract 65 New Traffic SignalsAs Needed City-wide Pavement Preserv…Bosworth/Monterey Connections Quick-…Various Locations Sewer Replacement …Contract 65 New Traffic Signals: construction Oct 2022 to 30 Nov 2025As Needed City-wide Pavement Preservation 6 (General As-Needed Contract G29): construction 2 Apr 2025 to 27 Dec 2027Bosworth/Monterey Connections Quick-Build Project: construction Jan 2027 to 31 May 2027Various Locations Sewer Replacement No 40: construction 4 Aug 2028 to 4 Aug 2029Cayuga Avenue Slow Street: construction 1 Oct 2026 to 31 Dec 2029Oct 2022 – 30 Nov 2025Jan 2027 – 31 May 20271 Oct 2026 – 31 Dec 20292 Apr 2025 – 27 Dec 20274 Aug 2028 – 4 Aug 2029

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments
4 documents on the project page